Robert Bosch LLC, PLY 111 Office and Lab, Phase 2

Plymouth Township, Michigan

Client | Reference

Robert Bosch, LLC

Complete

Design 2014

Construction 2015

Project Team

Steve Sorensen, PE, Proj Mgr

Scott Sieg, Proj Designer

Architect

Harley Ellis Devereaux

PEA and Harley Ellis Devereaux completed Phase 2 of the new Office and Prototype Development Center for the Robert Bosch Corporation. The 220,500 sf facility along Five Mile and Haggerty Roads, which is situated on a partially wooded 76-acre site, is the second of three phases that will eventually total more than 1.2 million sf. The facility serves as a Technical Center for Bosch, housing administrative, research and development and engineering space.

In terms of innovation, the site features a sustainable landscape with indigenous plantings such as native tree groupings and prairie-meadow species to cover the ground plan. Stormwater is captured on site and channeled through bioswales, rain gardens and wetlands to allow filtration to occur.

This project included the design of infrastructure including roads, water main, storm and sanitary sewer extensions. An extensive study of the existing site was completed in order to minimize any impact on the natural features.

Services Provided

Surveying, civil engineering, stormwater management, site planning, utilities, roadway, bio-detention systems, final engineering | construction design and permitting.